Kitchen Remodel Timeline: What to Expect in Dallas-Fort Worth
The sequence of a kitchen remodel, so you know what comes next.
Step 1: Scope, Design, and Selections
We confirm the scope, set allowances, and finalize layouts. Cabinet and countertop selections are locked early to prevent lead-time delays.
Step 2: Ordering and Pre-Construction Planning
Materials are ordered, trade schedules are confirmed, and a site protection plan is set. This is where delays are prevented.
Step 3: Demo and Rough-Ins
Existing finishes are removed, and rough plumbing, electrical, and HVAC updates are completed. Inspections happen before walls close.
Step 4: Drywall, Cabinets, and Surfaces
Drywall is installed and finished, cabinets are set, and countertops are templated and installed once cabinets are in place.
Step 5: Trim, Paint, and Final Install
Backsplash, lighting, fixtures, and trim are installed. Final paint and punch-list items complete the project.
Final Walkthrough
We review every detail with you, confirm the scope is complete, and hand off documentation and warranty information.
Want a kitchen remodel plan tailored to your home?
Request a Free Estimate